Preparatory work for the foundation Preparatory stage:
- Measure and evaluate the object;
- Cutting the land, if necessary;
- Land removal;
- Prepare the base with ballast and filler fraction;
- Installation of headlights (molds);
- Cover with polyethylene tape;
- Cover or knit ready-made rebar;
- Ground compaction with special vibrating machines;
- Determination of the compression ratio and laboratory conclusion;
- Installation of traps till the indicator (mark);
- Installation the head of wells (or sewer wells) to the mark;
- Installation and removal of sewerage and drainage system